In case you’re preparing for the CSTE testing certification exam or thinking of appearing in the test in the approaching days, this collection of questions will be useful for your preparation. We have incorporated several questions from past CSTE objective type question papers in it.
Recommended IPTV Service Providers
- IPTVGREAT – Rating 4.8/5 ( 600+ Reviews )
- IPTVRESALE – Rating 5/5 ( 200+ Reviews )
- IPTVGANG – Rating 4.7/5 ( 1200+ Reviews )
- IPTVUNLOCK – Rating 5/5 ( 65 Reviews )
- IPTVFOLLOW -Rating 5/5 ( 48 Reviews )
- IPTVTOPS – Rating 5/5 ( 43 Reviews )
IT professionals specializing in Software Testing/Quality Assurance can participate in this test to assess their expertise in testing.
You can opt to note down your responses against each question or use a printout to mark your responses for all 25 questions. You can then cross-verify your answers on the answer key that can be found at the end of this test.
Ready to take the practice test?
Let’s begin now!
The questions are listed below:
Q #1) Define Verification:
a. Certifying that we’re building the right system
b. Ensuring that we’re constructing the system correctly
c. Conducted by an independent test team
d. Confirming that this is indeed what the client needs
Q #2) A Regression test:
a. Must always be automated
b. Helps certify that unmodified regions of the software haven’t been affected
c. Ensures that amended parts of the software haven’t been affected
d. Can only be carried out during user acceptance testing
Q #3) If an expected outcome is not specified then:
a. We cannot proceed with the test
b. Repeating the test might be challenging
c. Determining if the test has succeeded or failed might be difficult
d. Automating user inputs isn’t possible
Q #4) Which of the following can be a reason for failure?
1) Testing error
2) Software glitch
3) Design flaw
4) Environmental Issue
5) Documentation Error
a. 2 could be a legit reason; 1,3,4 & 5 couldn’t be
b. 1,2,3,4 hold valid reasons; 5 doesn’t
c. 1,2,3 are valid reasons; 4 & 5 are not
d. All of these can cause failure
Q #5) Tests are prioritized so that:
a. The required time for testing is reduced
b. You can undertake the most efficient testing within the available time frame
c. You can conduct more impactful testing
d. You’ll detect more errors
Q #6) Which of the following does not belong to Static Testing methods?
a. Error guessing
b. Walkthrough
c. Data flow analysis
d. Inspections
Q #7) Which statement does not hold true regarding Component Testing?
a. The development team undertakes component testing
b. Component testing is also identified as isolation or module testing
c. Component testing should have predetermined completion criteria
d. Component testing does not encompass regression testing
Q #8) During which test activity can faults be discovered most economically?
a. Execution
b. Design
c. Planning
d. Checking completion of Exit criteria
Q #9) Which, in essence, is the least necessary competency of a tester?
a. Being diplomatic
b. Capability to write software
c. Possessing keen attention to detail
d. Being dependable
Q #10) The mission of the Requirement Phase is:
a. To solidify requirements
b. Understanding user needs
c. To outline the scope of testing
d. All of the options mentioned
Q #11) The process beginning with the terminal modules is termed:
a. Top-down integration
b. Bottom-up integration
c. Neither of the options
d. Module integration
Q #12) The inputs for preparing a test plan are extracted from:
a. Project plan
b. Business plan
c. Maintenance plan
d. None of the options
Q #13) Function/Test matrix is a type of:
a. Interim Test summary
b. Final test summary
c. Project status summary
d. Executive summary
Q #14) Defect Management process does not include:
a. Defect prevention
b. Baseline establishment of deliverables
c. Managerial reporting
d. None of the options
Q #15) What’s the distinction between testing the software developed by overseas contractors vs testing software created by a domestic contractor?
a. Doesn’t cater to people’s requirements
b. Cultural discrepancies
c. Loss of control over resources reallocation
d. Surrender of control
Q #16) What percent of Software Development Costs is accounted by Software Testing?
a. 10-20
b. 40-50
c. 70-80
d. 5-10
Q #17) Define a reliable system:
a. It’s unlikely to be completed as per schedule
b. It’s less likely to cause a failure
c. It’s likely to be error-free
d. It’s likely to be user-preferred
Q #18) What defines enough testing?
a. There’s no definitive answer to this question
b. The answer depends on your business’s risk, contract, and precise requirements
c. The answer is contingent on the maturity of your developers
d. The software development industry should have a standardized answer
Q #19) Which of the following is not a trait of Testability?
a. Operability
b. Observability
c. Simplicity
d. Robustness
Q #20) Which Testing method does the Cyclomatic Complexity method fall under?
a. White box
b. Black box
c. Green box
d. Yellow box
Q #21) Which of these can be effectively tested using the Loop Testing methodology?
a. Basic Loops
b. Nested Loops
c. Joined Loops
d. All options mentioned
Q #22) To analyze a function, the programmer must write a ______, which triggers the function and inputs test data.
a. Stub
b. Driver
c. Proxy
d. None of the options
Q #23) Elucidate Equivalence Partitioning:
a. A black box testing methodology utilized solely by developers
b. A black box testing methodology that can only be employed during system testing
c. A black box testing methodology suited for all phases of testing
d. A white box testing methodology suited for component testing
Q #24) When new testing software is procured, it should initially be used by:
a. A small group to figure out the optimal usage strategy
b. All individuals who might find some use in the software eventually
c. The independent testing group
d. The vendor’s contractor to draft the initial scripts
Q #25) All of the following can be discovered through Inspections except:
a. Undefined variables in the code
b. Spelling and grammar errors in the documentation
c. Missing requirements in the design documents
d. Code coverage extent